Searching for Wall or Floor System That Speeds up Construction?

Load-Bearing Exterior Wall System

The construction of commercial, industrial and institutional buildings can be exponentially accelerated through the use of prefabricated, factory-assembled load-bearing wall panels. Since these walls are manufactured under ideal conditions and with strict quality control, labour on site is considerably reduced  which therefore speeds up construction schedule considerably.

Discover a compelling example of construction speed with this time-lapse video showing the expansion of a commercial building in less than three weeks!

This type of load-bearing wall can also be used for buildings such as:

  • Fire stations
  • Schools
  • Offices and mixed-use buildings
  • Shopping centers

Composite Floor System

The construction of multi-residential buildings can be accelerated by the use of a composite floor system. This system can reduce the erection schedule of the superstructure by up to 25%. The quick installation of floors makes it possible to accelerate access to other trades.

Witness a quick installation with this time-lapse video presenting the erection of a superstructure of 140,791 ft² (13,080 m²) in only 15 weeks!

This floor system is widely used throughout North America for the construction of multi-storey buildings. The joists that are part of the system are known for their unsupported spans that reach up to 13.1 m (43 ft) and for providing maximum openings through the floor assembly.

You benefit from the reduced height and large free spans.

With Hambro composite floor system and Murox prefabricated wall system, Canam Buildings provides homeowners, developers and general contractors optimized building system solutions for commercial, industrial, institutional and multi-residential projects.

See our projects and discover the Canam difference.