Photo gallery

XNRGY Production Facility

Project details

Location

Saint-Hubert, QC, Canada

Year

2020

Customer

Les industries V.M Inc.

Owner

XNRGY Holdings

Architect

Francine Dubeau Architecte

Engineer

Les Conseillers BCA consultants Inc.

General contractor

Divco

Steel erector

Structure Lemoyne Inc.

Steel fabricator

Les Industries V.M. Inc.

Description

Construction of the XNRGY Production Centre offering engineering and manufacturing services for HVAC systems across North America with a focus on reducing carbon footprint and energy consumption.

The new facility will cater to the needs of industrial and commercial customers, especially data centers which are increasing in number in the Greater Montreal area.

The project will sit on an industrial site of 1,200,000 ft.2 (111,484.1 m2) and include an office building along with the production facility.

 

Features

The two-slope joists included in this project are of variable height and are up to 60 ft. (18.3 m) long.

Area: 127,360 ft.2 (11,832 m2)

 

Products

  • Standard joists
  • Non-standard joists (2 slopes)
  • Long-span joists
  • Mid-span joists