Saint-Laurent, QC, Canada
2013
Select Steel
Société de transport de Montréal (STM)
Lemay & Associates
Pasquin St-Jean and Associates
L.A. Hébert
Select Steel
Canam Buildings services were selected for the supply of the Stinson Transport Centre’s steel structure. It is the Montreal Transit Corporation’s (STM) first entirely covered transport centre with a capacity of 300 vehicles and employing 800 workers. This Transit Centre aims for a Gold LEED Certification.
Canam Buildings supplied joists, joist girders, welded wide-flange (WWF) and steel deck. The roof was treated as a fifth facade. No mechanical equipment is visible and the customer insisted on the importance of vegetation-covered surfaces. A technical challenge for Canam Buildings due to the complex geometry of certain building components.
Area: 392,881 ft2 (36,500 m2), which is equivalent to seven football fields.