Wiscasset, Maine, United States
2014
PC Construction Company
Twins Rivers LLC
Harriman Associates
Canam’s services were selected for the supply and installation of the entire envelope for the Mölnycke Health Care addition.
Canam provided Murox shop-fabricated load-bearing wall panels as well as conventional steel structure such as joists, joist girders and structural components. This building was completed in 11 weeks, one week ahead of schedule.
Area: building of 34,000 ft2 (3,159 m2) and mezzanine of 4,000 ft2 (372 m2).