HS-2 Water Treatment Plant

Project details

Location

Mont-Wright, QC, Canada

Year

2021

Customer

ArcelorMittal Mining Canada G.P.

Owner

ArcelorMittal Mining Canada G.P.

Engineer

gbi experts-conseils Inc.

General contractor

ArcelorMittal Mining Canada G.P.

Steel erector

Structures de Beauce

Steel fabricator

Canam Group Inc.

Description

Construction of the HS-2 water treatment plant at Mont-Wright, Quebec, a mining site near the town of Fermont on the Côte-Nord.

This plant will treat more than 8,000,000 litres of water per year.

 

Features

Efficient coordination

The work, in a remote region and during a pandemic period, required close follow-up with the various suppliers to ensure the availability of labour and materials. Weekly meetings were held with the client and its professionals to carry out the required technical coordination.

Ahead of schedule

The erection of the steel structure and the exterior finish of the building, which was scheduled to take seven weeks, was completed in five weeks. 

Area: 2,959 m2 (31,850 ft.2)

 

Products

  • Joists
  • Murox wall panels
  • Conventional steel structure
  • Steel deck

 