South Burlington, VT, United States
2020
ReArch Company
SunCap Property Group
S2 Architecture
Cross Consulting Engineers
ReArch Company
Canam
Construction of the FedEx distribution center located in South Burlington, Vermont, a building that operates 24 hours a day, 365 days a year. This distribution center will be used for packaging, distribution and international shipping.
A team in partnership
The team of partners including the general contractor, the engineer, the architect, the steel fabricator and the owner played a vital, if not essential, role in the success of this project. Canam steel components including Murox prefabricated panels were preferred for this construction in order to provide a complete building on a tight schedule.
For this project, Canam provided 270 tons of joist and joist girders and 180 tons of structural steel.
Area: 148,303 ft.2 (13,777.9 m2)