Photo gallery

Eldorado Gold Québec

Project details

Location

Val-d’Or, QC, Canada

Year

2020

Customer

Immeubles Dion

Owner

Eldorado Gold Québec

Architect

TRAME

Engineer

WSP

General contractor

Immeubles Dion

Steel erector

Structures MFV Inc.

Steel fabricator

Canam

Description

Construction of the administrative building for the mining company Eldorado Gold Québec located in Val-d’Or, Quebec. This building includes, among other amenities, a mezzanine and a special room that allows workers to dry their clothes in baskets hung on joists.

 

Features

Strict job site management

Considering the special features of mining sites, a more sustained job site management and daily follow-ups on health and safety aspects were required.

Under very good weather conditions, the building was erected in four weeks, instead of the five originally planned. 

In planning for a future expansion, non-load bearing Murox wall panels were installed on one side of the building only, which will facilitate the operation. 

Area: 16,856 ft.2 (1,566 m2) with mezzanine

 

Products

  • Murox wall panels
  • Joists
  • Steel deck
  • Conventional steel structure
  • Bridgings
  • Doors and windows integrated into the panels

 

Services

  • Design-build service
  • Installation of Murox wall panels
  • Erection of the steel structure

Related projects