Photo gallery

Bluebird Self Storage

Project details

Location

Calgary, Alberta

Year

2020

Customer

Create Construction Group LTD.

Owner

StoreWest Developments

Architect

Axiom Architecture

General contractor

Create Construction Management

Description

Three story 116,000-ft.2 Self Storage Facility  

Features

Canam delivered a high end self storage facility, designed and built with a design-assist, supply and install solution for the entire structural steel package and exterior Insulated Metal Panels envelope.

The project presented several challenges, among which: maintaining the clear height between floors and respecting the unique design loads.

Canam’s early involvement allowed it to provide significant Design-assist input both for the structural steel and IMP’s.

Area: 120,875 ft.2 (11,300 m2)

 

Products

  • Joists
  • Open Web Steel Joists
  • Steel Deck
  • Insulated Metal Panels (IMP’s)

Services

  • Design-Assist

Related projects