Thunder Bay, ON, Canada
2017
ReSolve Project Management Ltd.
T.B. Properties LP
BrookMcIlroy
Atkins + Van Groll
BNL Contracting
Structures de Beauce/Coastal Steel
Coastal Steel
Construction of the Delta Hotels located on the northwestern shore of Lake Superior in Thunder Bay, Ontario. This hotel has 150 rooms spread on eight floors and includes a conference centre.
The Hambro D500 composite floor system was the ideal solution for the installation of HVAC systems, electrical wiring and plumbing conduits. Due to the joist girders used in its composition, all systems and conduits were installed through its openings.
Area: 100,000 ft.² (9,290 m²)