Courtyard Marriott Hotel

Project details

Location

Saskatoon, SK, Canada

Year of Construction

2014

Customer

Les Constructions CMI Inc.

Owner

Triple One Properties Ltd.

Architects

API Consultants

Engineers

Millenium Engineering Inc.

General Contractor

Les Constructions CMI inc.

Description

Canam’s services were selected for the steel structure supply and installation of the Hambro D500 composite floor system and light steel load-bearing walls for the Courtyard Marriott Hotel located in Saskatoon, Saskatchewan. This hotel was realized with the BuildMaster approach.

The Hambro D500 composite floor system has been installed on five of this beautiful six-story hotel.

Canam supplied Hambro D500 joists, Canam joists, structural components and steel deck. Area: 82,000 ft2 (7,618 m2).