Londonderry, NH, United States
2016
Green Leaf Construction Ltd.
CI Design Inc.
Summit Engineering
Green Leaf Construction Ltd.
Construction of a Central Distribution Centre in Londonderry, one of the largest distribution centres built in the State of New Hampshire.
This centre was built for a wholesale distributor of plumbing, heating, ventilation and air conditioning (HVAC) products. It includes a warehouse, a two-storey office building, conference rooms and other amenities.
A megastructure
The entire structure, consisting of 2,340 tons of steel, is supported on load-bearing precast concrete wall panels.
An accelerated schedule
The schedule was accelerated by two weeks at the client’s request.
Area: 73,400 m2 (790,000 ft.2), the size of 11 football fields