Photo gallery

4th Avenue Residences at Northwest

Project details

Location

Burlington, MA, United States

Year built

2021-2022

Customer

Erland Construction, Inc.

Owner

Nuclear Waste Partnership LLC

Architect

Stantec

Engineer

Odeh Engineers

General contractor

Erland Construction, Inc.

Steel erector

Canam

Canam product

Hambro

Description

Construction of 4th Avenue at Northwest Park Apartments in Burlington, Massachusetts, USA, a five-storey multi-residential building comprising 168 units.

On the first floor, 169 covered parking spaces are available, while on the second floor, two large outdoor terraces with barbecues, fireplaces, a covered metal pergola and garden furniture are available to residents. The building also includes a bike room, games room, lounge with fireplace and private event space.

 

Features

Meeting the schedule

Due to a delay in the project, caused by the late completion of the concrete work in the early phases of the construction, Canam was asked to speed up the originally agreed erection schedule. A second crane and manpower was added to successfully meet the aggressive deadline.

The benefits of a structural building system

The structural building system helped to keep the project on schedule by having expertise and multiple trades under Canam’s umbrella.

Area: 17,337 m2 (186,610 ft.2)

 

Products

Hambro complete structural building system consisting of:

  • Hambro D500 composite floor system
  • Load-bearing steel stud wall panels
  • Permanent steel forming system for concrete shear walls, elevators and stairwell shafts
  • Open-web steel joists and steel deck
  • Cantilevered precast balconies

 

Services

  • Design-build
  • Erection of the complete steel structure

 

We invite you to listen to our podcast where four involved experts, including Wayne Peters, Manager of Project Management at Canam, discuss the project details

 